NESO TEC REGISTER Β· GREAT BRITAINGrid connection projects in the connection queue on the SSEN Transmission (north Scotland) network
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Clashindarroch 2 Onshore wind Β· Vattenfall Wind Power Ltd |
63 MW | Under Construction/Commissioning |
| Lochay (Part of Killin Cascade Hydro Scheme) Hydro and pumped storage Β· Sse Generation Limited |
51 MW | Under Construction/Commissioning |
| Persley Croft BESS Battery storage Β· Persley Croft BESS Ltd |
50 MW | Under Construction/Commissioning |
| Keithick Estate Solar + storage Β· Sirius Ecodev (Stirling) Ltd |
50 MW | Under Construction/Commissioning |
| Keith 132 Greener Grid Park Battery storage Β· Keith Storage Solutions Limited |
48 MW | Under Construction/Commissioning |
| Bilbo Farm Solar + storage Β· Lel Bilbo Solar Limited |
25 MW | Under Construction/Commissioning |
| Kincraig Energy Centre Solar + storage Β· Kincraig Energy Centre Limited |
21 MW | Under Construction/Commissioning |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed βconnection nodesβ are listed but not mapped.