Grid connection projects in the connection queue on the SSEN Transmission (north Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown7308 MW in total
In planning303scoping or awaiting consent
Consented or building52closest to connecting
Built89connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

7 projects
ProjectCapacityStageConnection siteFrom
Clashindarroch 2
Onshore wind Β· Vattenfall Wind Power Ltd
63 MWUnder Construction/Commissioning Cairnford GSP
SSEN Transmission (north Scotland)
Jun 2027
Lochay (Part of Killin Cascade Hydro Scheme)
Hydro and pumped storage Β· Sse Generation Limited
51 MWUnder Construction/Commissioning Lochay 132/11kV Substation
SSEN Transmission (north Scotland)
Jan 2027
Persley Croft BESS
Battery storage Β· Persley Croft BESS Ltd
50 MWUnder Construction/Commissioning Persley 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Jul 2026
Keithick Estate
Solar + storage Β· Sirius Ecodev (Stirling) Ltd
50 MWUnder Construction/Commissioning Coupar Angus 132/33kV GSP
SSEN Transmission (north Scotland)
Dec 2026
Keith 132 Greener Grid Park
Battery storage Β· Keith Storage Solutions Limited
48 MWUnder Construction/Commissioning Keith 132kV Substation
SSEN Transmission (north Scotland)
Apr 2029
Bilbo Farm
Solar + storage Β· Lel Bilbo Solar Limited
25 MWUnder Construction/Commissioning Strichen 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Jun 2024
Kincraig Energy Centre
Solar + storage Β· Kincraig Energy Centre Limited
21 MWUnder Construction/Commissioning Dyce 132/33kV GSP
SSEN Transmission (north Scotland)
Apr 2025

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.