Home › Grid infrastructure › Connection queue
NESO TEC REGISTER · GREAT BRITAINBattery storage projects in the connection queue on the National Grid (England & Wales) network
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Red House Farm - Friston 400kV 249MW connection Battery storage · Cambridge Power Limited |
249 MW | Scoping |
| Sheaf Energy Battery storage · Sheaf Energy Limited |
249 MW | Consents Approved |
| Aberthaw BESS Battery storage · Rewe 7 Limited |
240 MW | Scoping |
| Beddington 1 BESS Battery storage · Bluestone Beddington 1 Ltd |
240 MW | Scoping |
| Beddington 2 BESS Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Butt Lane - Grimsby BESS Battery storage · Bluestone Butt Lane 1 Ltd |
240 MW | Scoping |
| Catsfield Battery storage · MAS 001 Limited |
240 MW | Scoping |
| Chessington Estate Battery storage · Chessington BESS Ltd |
240 MW | Scoping |
| Cilfynydd 2 Battery storage · Rewe 8 Limited |
240 MW | Scoping |
| Coddington Battery storage · Starlight Energy UK Limited |
240 MW | Scoping |
| CRT Keadby 2 Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Drakelow Power Station 1 BESS Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Drakelow Power Station 2 BESS Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Drakelow Power Station 3 BESS Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Drakelow Power Station 4 Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Fairmead and Yewtree Farm Battery storage · Qair Renewables UK Limited |
240 MW | Scoping |
| Forepower Lincoln (250) Ltd Battery storage · Forefuture Energy Ltd |
240 MW | Scoping |
| Grovers Farm BESS Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Henley Downs Farm BESS Battery storage · Ninfield BESS Ltd |
240 MW | Scoping |
| Hill Farm Battery storage · Qair Renewables UK Limited |
240 MW | Scoping |
| Hipsey BESS Battery storage · Kona Asset 2 Limited |
240 MW | Scoping |
| Intwood Farm BESS Battery storage · Intwood BESS Ltd |
240 MW | Scoping |
| Lambeeth 240MW Battery storage · Ecodev Group Ltd |
240 MW | Scoping |
| Mountain Fen Battery storage · Lightsource Spv 204 Limited |
240 MW | Scoping |
| NEL Bluebell Battery storage · SFEL Bluebell Limited |
240 MW | Scoping |
| NEL Conway2 Battery storage · JJS 3 Limited |
240 MW | Scoping |
| NEL Springfield Battery storage · UE 3 LTD |
240 MW | Scoping |
| NEL Story Battery storage · Story Energy Limited |
240 MW | Scoping |
| NEL Suggit Battery storage · SFEL One Limited |
240 MW | Scoping |
| Ocker Hill - Gresham House Battery storage · Ocker Hill Storage Limited |
240 MW | Consents Approved |
| Siddington BESS Station Battery storage · Ibv Birtles Hill Energy Park Ltd |
240 MW | Scoping |
| Solomons Farm BESS Battery storage · Solomons BESS Ltd |
240 MW | Scoping |
| St. Marys Lane - Upminster BESS Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Stoke Bardolph Battery storage · Source Galileo Limited |
240 MW | Scoping |
| Upminster Warley 3 Battery storage · Bluestone Energy Ltd |
240 MW | Scoping |
| Wacton Road Farm Battery storage · Qair Renewables UK Limited |
240 MW | Scoping |
| Weaver BESS Battery storage · Frodsham Devco Limited |
240 MW | Scoping |
| Willington BESS Station Battery storage · Ibv Willington Energy Park Limited |
240 MW | Scoping |
| Shaw Lane BESS Battery storage · Shaw Lane BESS Limited |
230 MW | Scoping |
| NEL Lackenby Battery storage · Newton Energi Limited |
228 MW | Scoping |
| Patford Bridge BESS Battery storage · Kona Energy Limited |
228 MW | Scoping |
| Wymondham Road Farm Battery storage · Qair Renewables UK Limited |
228 MW | Scoping |
| Woodlands Farm BESS Battery storage · Sky UK Development Limited |
228 MW | Scoping |
| Imperial Park BESS Battery storage · Kona Asset 4 Limited |
225 MW | Scoping |
| Lanehurst Farm BESS Battery storage · Elgin Energy Es Co Limited |
225 MW | Scoping |
| Ninfield BESS Battery storage · Kona Energy Limited |
225 MW | Scoping |
| Ratcliffe on Soar Battery storage · Uniper UK Limited |
225 MW | |
| Rhigos BESS Battery storage · Kona Asset 4 Limited |
225 MW | Scoping |
| Rhigos BESS Battery storage · Enviromena Project Management UK Limited |
221 MW | Scoping |
| Hurst BESS Battery storage · Firstway Solar Ltd |
212 MW | Scoping |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.