NESO TEC REGISTER · GREAT BRITAINGrid connection projects in the connection queue on the National Grid (England & Wales) network
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Frome Valley Energy Park Solar + storage · Biosouth Energy Limited |
43 MW | Scoping |
| Gammidge PV & BESS Park Battery storage · Cs UK Holdings III Limited |
41 MW | Scoping |
| 014 NEP Bransholme Battery storage · New Energy Partnership Limited |
40 MW | Scoping |
| Carlisle Road Battery storage · Mercia Power Response Limited |
40 MW | Scoping |
| Darnall Road Battery storage · Mercia Power Response Limited |
40 MW | Scoping |
| South Brook Solar + storage · JBM Solar Limited |
36 MW | Awaiting Consents |
| Wymondley BESS Limited Battery storage · Agr Renewables Limited |
36 MW | Awaiting Consents |
| Tale Lane Solar / A008 Langford Solar + storage · Jbm Solar Projects 2 Ltd |
35 MW | Scoping |
| Barrow Battery storage · New Energy Partnership Limited |
30 MW | Scoping |
| Rayleigh GP3 Battery storage · Enso Green Holdings J Limited |
30 MW | Scoping |
| Norwich 2 Solar · Edf Energy Renewables Limited |
28 MW | Scoping |
| Feckenham Greener Grid Park Battery storage · Statkraft UK Ltd |
12 MW | Scoping |
| Bolney Grid Stability Services Other · Wp Grid Services 13 Limited |
0 MW | Scoping |
| GF Upper Boat Battery storage · Pulse Clean Energy Spv Franklin Limited |
0 MW | Scoping |
| GF Upper Boat Battery storage · Pulse Clean Energy Spv Franklin Limited |
0 MW | Scoping |
| Ninfield Greener Grid Park Battery storage · Ninfield Grid Solutions Limited |
0 MW | Awaiting Consents |
| Rassau Stability Services Limited Other · WP Grid Services 16 Limited |
0 MW | Scoping |
| Spennymoor Greener Grid Park Battery storage · Spennymoor Grid Solutions Limited |
0 MW | Awaiting Consents |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.