ONSHORE WIND Β· MISOOnshore wind project J081, Mercer County
Onshore wind project J081, Mercer County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Mercer County, North Dakota.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2009 (completed)
- Withdrawn / abandonedSep 2011 (project stopped here)
- ConsentedSep 2011 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J081
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Coyote - Green River 100-161 kV
- Location
- Mercer County, North Dakota
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 5 October 2009
- Agreement signed
- 19 September 2011
- Proposed online date
- March 2011
- Withdrawn
- September 2011
Location
Marker shows the centre of Mercer County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Mercer County
- Solar project GEN-2019-037, Mercer CountySolar Β· 150 MW Β· agreement signed
- Gas project ERAS-2025-012, Mercer CountyGas Β· 750 MW Β· in study
- Gas project ERAS-2025-011, Mercer CountyGas Β· 750 MW Β· in study
- Onshore wind project GEN-2024-141, Mercer CountyOnshore wind Β· 424 MW Β· in study
- Solar project GEN-2024-284, Mercer CountySolar Β· 199 MW Β· in study
- Onshore wind project GI-1508, Mercer CountyOnshore wind Β· 172 MW Β· in study
- Onshore wind project GEN-2016-130, Mercer CountyOnshore wind Β· 202 MW Β· built
- Other project GI-0101, Mercer CountyOther Β· 8.0 MW Β· built
- Solar project GEN-2021-072, Mercer CountySolar Β· 600 MW Β· withdrawn
- Coal project GI-0321, Mercer CountyCoal Β· 510 MW Β· withdrawn
- Gas project GEN-2021-095, Mercer CountyGas Β· 447 MW Β· withdrawn
- Gas project GEN-2021-094, Mercer CountyGas Β· 447 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem