GAS Β· SPP

Gas project GEN-2021-094, Mercer County

Gas project GEN-2021-094, Mercer County is a 447 MW gas request withdrawn in the SPP interconnection queue, in Mercer County, North Dakota, connecting to BEPC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedNov 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingApr 2025 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2021-094
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
BEPC
Connection point (POI)
AVS 345kV Substation
Location
Mercer County, North Dakota
Technology
Gas: 447 MW
Total requested
447 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 April 2021
Proposed online date
April 2025
Came online
April 2025
Withdrawn
November 2022

Location

Marker shows the centre of Mercer County; the queue data does not give exact sites.