OTHER · WESTOther project GI-0101, Mercer County
Other project GI-0101, Mercer County is a 8.0 MW other request built and operating in the West interconnection queue, in Mercer County, North Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Request details
- Queue ID
- GI-0101
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Ant Valley
- Location
- Mercer County, North Dakota
- Technology
- Other: 8.0 MW
- Total requested
- 8.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- IAE/ IS
- Queue status
- Operational
- Entered queue
- 31 January 2001
- Proposed online date
- September 2006
Location
Marker shows the centre of Mercer County; the queue data does not give exact sites.
Power plants in North Dakota · Transmission lines in North Dakota
Other requests in Mercer County
- Solar project GEN-2019-037, Mercer CountySolar · 150 MW · agreement signed
- Gas project ERAS-2025-012, Mercer CountyGas · 750 MW · in study
- Gas project ERAS-2025-011, Mercer CountyGas · 750 MW · in study
- Onshore wind project GEN-2024-141, Mercer CountyOnshore wind · 424 MW · in study
- Solar project GEN-2024-284, Mercer CountySolar · 199 MW · in study
- Onshore wind project GI-1508, Mercer CountyOnshore wind · 172 MW · in study
- Onshore wind project GEN-2016-130, Mercer CountyOnshore wind · 202 MW · built
- Solar project GEN-2021-072, Mercer CountySolar · 600 MW · withdrawn
- Coal project GI-0321, Mercer CountyCoal · 510 MW · withdrawn
- Gas project GEN-2021-095, Mercer CountyGas · 447 MW · withdrawn
- Gas project GEN-2021-094, Mercer CountyGas · 447 MW · withdrawn
- Solar + storage project J2883, Mercer CountySolar + storage · 347 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem