Onshore wind project GEN-2016-155, Burleigh County

Onshore wind project GEN-2016-155, Burleigh County is a 1.3 MW onshore wind request withdrawn in the SPP interconnection queue, in Burleigh County, North Dakota, connecting to WAPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2016 (completed)
  2. Withdrawn / abandonedMar 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2016-155
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WAPA
Connection point (POI)
Hilken 230kV
Location
Burleigh County, North Dakota
Technology
Wind: 1.3 MW
Total requested
1.3 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 November 2016
Proposed online date
December 2017
Withdrawn
March 2020

Location

Marker shows the centre of Burleigh County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Burleigh County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem