Onshore wind project GEN-2016-035, Burleigh County

Onshore wind project GEN-2016-035, Burleigh County is a 265 MW onshore wind request withdrawn in the SPP interconnection queue, in Burleigh County, North Dakota, connecting to WAPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2016 (completed)
  2. Withdrawn / abandonedAug 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingJun 2018 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2016-035
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WAPA
Connection point (POI)
Tap Bismark β€šΓ„Γ¬ Mound Ridge 230 kV
Location
Burleigh County, North Dakota
Technology
Wind: 265 MW
Total requested
265 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 March 2016
Proposed online date
June 2018
Came online
June 2018
Withdrawn
August 2016

Location

Marker shows the centre of Burleigh County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Burleigh County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem