United States β€Ί Grid β€Ί Interconnection queues β€Ί Kansas

BATTERY STORAGE Β· SPP

Battery storage project GEN-2015-043, Pratt County

Battery storage project GEN-2015-043, Pratt County is a 20.0 MW battery storage request withdrawn in the SPP interconnection queue, in Pratt County, Kansas, connecting to WERE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2015 (completed)
  2. Withdrawn / abandonedMar 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2015-043
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WERE
Connection point (POI)
Proposed 345kV Substation on the Wichita to Thistle 345kV line, circuits 1 & 2
Location
Pratt County, Kansas
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
5 October 2015
Proposed online date
December 2017
Withdrawn
March 2016

Location

Marker shows the centre of Pratt County; the queue data does not give exact sites.

Power plants in Kansas Β· Transmission lines in Kansas

Other requests in Pratt County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem