ONSHORE WIND Β· SPPOnshore wind project GEN-2014-049, Pratt County
Onshore wind project GEN-2014-049, Pratt County is a 200 MW onshore wind request withdrawn in the SPP interconnection queue, in Pratt County, Kansas, connecting to MKEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2014 (completed)
- Withdrawn / abandonedNov 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2014-049
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- MKEC
- Connection point (POI)
- Thistle 345kV
- Location
- Pratt County, Kansas
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 29 September 2014
- Proposed online date
- December 2016
- Withdrawn
- November 2015
Location
Marker shows the centre of Pratt County; the queue data does not give exact sites.
Other requests in Pratt County
- Onshore wind project GEN-2019-001, Pratt CountyOnshore wind Β· 25.0 MW Β· agreement signed
- Solar project GEN-2024-257, Pratt CountySolar Β· 220 MW Β· in study
- Solar + storage project GEN-2024-272, Pratt CountySolar + storage Β· 199 MW Β· in study
- Onshore wind project GEN-2015-025, Pratt CountyOnshore wind Β· 220 MW Β· built
- Onshore wind project GEN-2015-024, Pratt CountyOnshore wind Β· 220 MW Β· built
- Onshore wind project GEN-2015-090, Pratt CountyOnshore wind Β· 220 MW Β· built
- Battery storage project GEN-2023-215, Pratt CountyBattery storage Β· 225 MW Β· withdrawn
- Onshore wind project GEN-2023-118, Pratt CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar project GEN-2023-111, Pratt CountySolar Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2009-003, Pratt CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2006-022, Pratt CountyOnshore wind Β· 150 MW Β· withdrawn
- Solar project GEN-2023-112, Pratt CountySolar Β· 130 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem