πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project G430, Pope County

Onshore wind project G430, Pope County is a 8.3 MW onshore wind request withdrawn in the MISO interconnection queue, in Pope County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2004 (completed)
  2. Withdrawn / abandonedAug 2005 (project stopped here)
  3. ConsentedAug 2005 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G430
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Pope County, Minnesota
Technology
Wind: 8.3 MW
Total requested
8.3 MW
Queue status
Withdrawn
Entered queue
8 May 2004
Agreement signed
19 August 2005
Proposed online date
June 2005
Withdrawn
August 2005

Location

Marker shows the centre of Pope County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Pope County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem