πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project G658, Pope County

Onshore wind project G658, Pope County is a 20.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Pope County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2006 (completed)
  2. Withdrawn / abandonedOct 2013 (project stopped here)
  3. ConsentedOct 2013 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G658
Grid region
MISO (Midcontinent)
Connection point (POI)
Xel Westport 69 kV Substation
Location
Pope County, Minnesota
Technology
Wind: 20.0 MW
Total requested
20.0 MW
Study phase
Network Upgrade
Queue status
Withdrawn
Entered queue
14 July 2006
Agreement signed
21 October 2013
Proposed online date
August 2008
Withdrawn
October 2013

Location

Marker shows the centre of Pope County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Pope County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem