ONSHORE WIND Β· MISO

Onshore wind project G657, Pope County

Onshore wind project G657, Pope County is a 20.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Pope County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2006 (completed)
  2. Withdrawn / abandonedOct 2013 (project stopped here)
  3. ConsentedOct 2013 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G657
Grid region
MISO (Midcontinent)
Connection point (POI)
Glenwood 69 kV sub
Location
Pope County, Minnesota
Technology
Wind: 20.0 MW
Total requested
20.0 MW
Study phase
Network Upgrade
Queue status
Withdrawn
Entered queue
14 July 2006
Agreement signed
23 October 2013
Proposed online date
September 2007
Withdrawn
October 2013

Location

Marker shows the centre of Pope County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Pope County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem