United States βΊ Grid βΊ Interconnection queues βΊ Ohio
ONSHORE WIND Β· MISOOnshore wind project G652, Erie County
Onshore wind project G652, Erie County is a 48.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Erie County, Ohio.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2006 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedJun 2010 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G652
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Bellevue - Castalia 69 kV
- Location
- Erie County, Ohio
- Technology
- Wind: 48.0 MW
- Total requested
- 48.0 MW
- Study phase
- Network Upgrade
- Queue status
- Withdrawn
- Entered queue
- 3 July 2006
- Agreement signed
- 15 June 2010
- Proposed online date
- January 2008
Location
Marker shows the centre of Erie County; the queue data does not give exact sites.
Other requests in Erie County
- Firelands WindOnshore wind Β· 298 MW Β· agreement signed
- Wheatsborough SolarSolar Β· 125 MW Β· built
- Erie County LandfillOther Β· 0.8 MW Β· built
- Solar project AD2-156, Erie CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project W3-059A_AT6, Erie CountyOnshore wind Β· 99.0 MW Β· withdrawn
- Onshore wind project J164, Erie CountyOnshore wind Β· 99.0 MW Β· withdrawn
- Solar + storage project AH1-417, Erie CountySolar + storage Β· 50.0 MW Β· withdrawn
- Battery storage project AG1-425, Erie CountyBattery storage Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem