BATTERY STORAGE Β· PJMBattery storage project AG1-425, Erie County
Battery storage project AG1-425, Erie County is a 20.0 MW battery storage request withdrawn in the PJM interconnection queue, in Erie County, Ohio, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedJun 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-425
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Developer
- Wheatsborough Solar, LLC
- Connection point (POI)
- Groton 138 kV
- Location
- Erie County, Ohio
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 September 2020
- Proposed online date
- October 2023
- Withdrawn
- June 2024
Location
Marker shows the centre of Erie County; the queue data does not give exact sites.
Other requests in Erie County
- Firelands WindOnshore wind Β· 298 MW Β· agreement signed
- Wheatsborough SolarSolar Β· 125 MW Β· built
- Erie County LandfillOther Β· 0.8 MW Β· built
- Solar project AD2-156, Erie CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project W3-059A_AT6, Erie CountyOnshore wind Β· 99.0 MW Β· withdrawn
- Onshore wind project J164, Erie CountyOnshore wind Β· 99.0 MW Β· withdrawn
- Solar + storage project AH1-417, Erie CountySolar + storage Β· 50.0 MW Β· withdrawn
- Onshore wind project G652, Erie CountyOnshore wind Β· 48.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem