United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMSolar project AD2-156, Erie County
Solar project AD2-156, Erie County is a 100 MW solar request withdrawn in the PJM interconnection queue, in Erie County, Ohio, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedApr 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AD2-156
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Avery 138 kV
- Location
- Erie County, Ohio
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 23 March 2018
- Proposed online date
- December 2020
- Withdrawn
- April 2018
Location
Marker shows the centre of Erie County; the queue data does not give exact sites.
Other requests in Erie County
- Firelands WindOnshore wind Β· 298 MW Β· agreement signed
- Wheatsborough SolarSolar Β· 125 MW Β· built
- Erie County LandfillOther Β· 0.8 MW Β· built
- Onshore wind project W3-059A_AT6, Erie CountyOnshore wind Β· 99.0 MW Β· withdrawn
- Onshore wind project J164, Erie CountyOnshore wind Β· 99.0 MW Β· withdrawn
- Solar + storage project AH1-417, Erie CountySolar + storage Β· 50.0 MW Β· withdrawn
- Onshore wind project G652, Erie CountyOnshore wind Β· 48.0 MW Β· withdrawn
- Battery storage project AG1-425, Erie CountyBattery storage Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem