United States β€Ί Grid β€Ί Interconnection queues β€Ί Ohio

SOLAR Β· PJM

Wheatsborough Solar

Wheatsborough Solar is a 125 MW solar request built and operating in the PJM interconnection queue, in Erie County, Ohio, connecting to ATSI.

Queue statusOperating
  1. PlanningQueued Mar 2019 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingAug 2025 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AE2-176
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ATSI
Connection point (POI)
Groton 138 kV Solar
Location
Erie County, Ohio
Technology
Solar: 125 MW
Total requested
125 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Operational
Entered queue
19 March 2019
Proposed online date
April 2025
Came online
August 2025

Location

Marker shows the centre of Erie County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Erie County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem