ONSHORE WIND Β· MISOOnshore wind project J164, Erie County
Onshore wind project J164, Erie County is a 99.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Erie County, Ohio.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2010 (completed)
- Withdrawn / abandonedJun 2011 (project stopped here)
- ConsentedJun 2011 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J164
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- FE Beaver - Greenfield 138kV
- Location
- Erie County, Ohio
- Technology
- Wind: 99.0 MW
- Total requested
- 99.0 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 10 September 2010
- Agreement signed
- 1 June 2011
- Proposed online date
- December 2014
- Withdrawn
- June 2011
Location
Marker shows the centre of Erie County; the queue data does not give exact sites.
Other requests in Erie County
- Firelands WindOnshore wind Β· 298 MW Β· agreement signed
- Wheatsborough SolarSolar Β· 125 MW Β· built
- Erie County LandfillOther Β· 0.8 MW Β· built
- Solar project AD2-156, Erie CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project W3-059A_AT6, Erie CountyOnshore wind Β· 99.0 MW Β· withdrawn
- Solar + storage project AH1-417, Erie CountySolar + storage Β· 50.0 MW Β· withdrawn
- Onshore wind project G652, Erie CountyOnshore wind Β· 48.0 MW Β· withdrawn
- Battery storage project AG1-425, Erie CountyBattery storage Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem