OTHER Β· MISOOther project J1656, Vermilion County
Other project J1656, Vermilion County is a 412 MW other request withdrawn in the MISO interconnection queue, in Vermilion County, Illinois, connecting to AMEREN ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1656
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN ILLINOIS
- Connection point (POI)
- Sydney to Bunsonville 345kV Line
- Location
- Vermilion County, Illinois
- Technology
- Solar: 412 MW Β· Wind
- Total requested
- 412 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 23 June 2020
- Proposed online date
- August 2023
- Withdrawn
- March 2025
Location
Marker shows the centre of Vermilion County; the queue data does not give exact sites.
Other requests in Vermilion County
- Surplus; AMIL.TILT1-4Solar Β· 188 MW Β· in study
- Solar project J3342, Vermilion CountySolar Β· 180 MW Β· in study
- Solar project J3340, Vermilion CountySolar Β· 175 MW Β· in study
- Solar project J2233, Vermilion CountySolar Β· 100 MW Β· in study
- Onshore wind project J3341, Vermilion CountyOnshore wind Β· 100 MW Β· in study
- Onshore wind project H100, Vermilion CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project H094, Vermilion CountyOnshore wind Β· 99.0 MW Β· built
- Onshore wind project J196, Vermilion CountyOnshore wind Β· 50.0 MW Β· built
- Gas project J388, Vermilion CountyGas Β· 800 MW Β· withdrawn
- Solar project J3562, Vermilion CountySolar Β· 300 MW Β· withdrawn
- Onshore wind project V3-032, Vermilion CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar project J3371, Vermilion CountySolar Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem