United States βΊ Grid βΊ Interconnection queues βΊ Illinois
ONSHORE WIND Β· PJMOnshore wind project V3-032, Vermilion County
Onshore wind project V3-032, Vermilion County is a 200 MW onshore wind request withdrawn in the PJM interconnection queue, in Vermilion County, Illinois, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2009 (completed)
- Withdrawn / abandonedJul 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- V3-032
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Darwin-Eugene 345kV
- Location
- Vermilion County, Illinois
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 1 September 2009
- Proposed online date
- September 2011
- Withdrawn
- July 2012
Location
Marker shows the centre of Vermilion County; the queue data does not give exact sites.
Other requests in Vermilion County
- Surplus; AMIL.TILT1-4Solar Β· 188 MW Β· in study
- Solar project J3342, Vermilion CountySolar Β· 180 MW Β· in study
- Solar project J3340, Vermilion CountySolar Β· 175 MW Β· in study
- Solar project J2233, Vermilion CountySolar Β· 100 MW Β· in study
- Onshore wind project J3341, Vermilion CountyOnshore wind Β· 100 MW Β· in study
- Onshore wind project H100, Vermilion CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project H094, Vermilion CountyOnshore wind Β· 99.0 MW Β· built
- Onshore wind project J196, Vermilion CountyOnshore wind Β· 50.0 MW Β· built
- Gas project J388, Vermilion CountyGas Β· 800 MW Β· withdrawn
- Other project J1656, Vermilion CountyOther Β· 412 MW Β· withdrawn
- Solar project J3562, Vermilion CountySolar Β· 300 MW Β· withdrawn
- Solar project J3371, Vermilion CountySolar Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem