United States › Grid › Interconnection queues › Illinois

SOLAR · MISO

Surplus; AMIL.TILT1-4

Surplus; AMIL.TILT1-4 is a 188 MW solar request in interconnection study in the MISO interconnection queue, in Vermilion County, Illinois, connecting to AMEREN ILLINOIS.

Queue statusIn planning
  1. PlanningQueued May 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1097
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN ILLINOIS
Connection point (POI)
Tilton Switchyard
Location
Vermilion County, Illinois
Technology
Solar: 188 MW
Total requested
188 MW
Queue status
Active
Entered queue
23 May 2025
Proposed online date
June 2027

Location

Marker shows the centre of Vermilion County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Vermilion County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem