United States › Grid › Interconnection queues › South Dakota
OTHER · WESTOther project GI-0214, Stanley County
Other project GI-0214, Stanley County is a 8.0 MW other request built and operating in the West interconnection queue, in Stanley County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Request details
- Queue ID
- GI-0214
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Irv. Simmons 115kV [Ft. Pierre 115k
- Location
- Stanley County, South Dakota
- Technology
- Diesel: 8.0 MW
- Total requested
- 8.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- IAE/IS
- Queue status
- Operational
- Entered queue
- 9 July 2002
Location
Marker shows the centre of Stanley County; the queue data does not give exact sites.
Power plants in South Dakota · Transmission lines in South Dakota
Other requests in Stanley County
- Coal project GI-0610, Stanley CountyCoal · 700 MW · withdrawn
- Onshore wind project GEN-2024-059, Stanley CountyOnshore wind · 200 MW · withdrawn
- Solar + storage project GEN-2023-066, Stanley CountySolar + storage · 130 MW · withdrawn
- Onshore wind project GI-0506, Stanley CountyOnshore wind · 100 MW · withdrawn
- Onshore wind project GI-0917, Stanley CountyOnshore wind · 99.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem