United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
COAL Β· WESTCoal project GI-0610, Stanley County
Coal project GI-0610, Stanley County is a 700 MW coal request withdrawn in the West interconnection queue, in Stanley County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2006 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-0610
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Oahe / Stanley - Dewey
- Location
- Stanley County, South Dakota
- Technology
- Coal: 700 MW
- Total requested
- 700 MW
- Service type
- NRIS and ERIS
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 3 August 2006
Location
Marker shows the centre of Stanley County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Stanley County
- Other project GI-0214, Stanley CountyOther Β· 8.0 MW Β· built
- Onshore wind project GEN-2024-059, Stanley CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar + storage project GEN-2023-066, Stanley CountySolar + storage Β· 130 MW Β· withdrawn
- Onshore wind project GI-0506, Stanley CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project GI-0917, Stanley CountyOnshore wind Β· 99.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem