Onshore wind project GI-0917, Stanley County

Onshore wind project GI-0917, Stanley County is a 99.0 MW onshore wind request withdrawn in the West interconnection queue, in Stanley County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-0917
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA/BEPC/HCPD Integrated System
Connection point (POI)
Oahe-Eagle Butte 115kV
Location
Stanley County, South Dakota
Technology
Wind: 99.0 MW
Total requested
99.0 MW
Service type
Energy only (ERIS)
Study phase
IAP
Queue status
Withdrawn
Entered queue
26 May 2009
Proposed online date
December 2011

Location

Marker shows the centre of Stanley County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Stanley County