United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
SOLAR + STORAGE Β· SPPSolar + storage project GEN-2023-066, Stanley County
Solar + storage project GEN-2023-066, Stanley County is a 130 MW solar + storage request withdrawn in the SPP interconnection queue, in Stanley County, South Dakota, connecting to WAPA.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedMar 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-066
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WAPA
- Connection point (POI)
- Tap Pierre - Midland 115 kV line
- Location
- Stanley County, South Dakota
- Technology
- Solar: 130 MW Β· Battery
- Total requested
- 130 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- November 2028
- Withdrawn
- March 2024
Location
Marker shows the centre of Stanley County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Stanley County
- Other project GI-0214, Stanley CountyOther Β· 8.0 MW Β· built
- Coal project GI-0610, Stanley CountyCoal Β· 700 MW Β· withdrawn
- Onshore wind project GEN-2024-059, Stanley CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GI-0506, Stanley CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project GI-0917, Stanley CountyOnshore wind Β· 99.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem