United States › Grid › Interconnection queues › Ohio
SOLAR + STORAGE · PJMSolar + storage project AI2-030, Adams County
Solar + storage project AI2-030, Adams County is a 50.0 MW solar + storage request in interconnection study in the PJM interconnection queue, in Adams County, Ohio, connecting to AEP.
Queue statusIn planning
- PlanningQueued Jan 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2024 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AI2-030
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Poplar Flat Switch - Brown Hill 69 kV
- Location
- Adams County, Ohio
- Technology
- Solar: 50.0 MW · Battery
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 18 January 2023
- Proposed online date
- December 2024
Location
Marker shows the centre of Adams County; the queue data does not give exact sites.
Other requests in Adams County
- Solar + storage project AH2-146, Adams CountySolar + storage · 87.2 MW · in study
- Solar project AI1-151, Adams CountySolar · 53.2 MW · in study
- Gavin 2Coal · 20.0 MW · built
- Gavin 1Coal · 20.0 MW · built
- Killen Electric Generating StationCoal · 12.0 MW · built
- Stuart Electric Generating StationCoal · 7.0 MW · built
- Coal project S12, Adams CountyCoal · 1,300 MW · withdrawn
- Battery storage project AH1-758, Adams CountyBattery storage · 500 MW · withdrawn
- Other project AE1-078, Adams CountyOther · 50.0 MW · withdrawn
- Other project AD2-053, Adams CountyOther · 50.0 MW · withdrawn
- Stone Branch SolarSolar · 49.9 MW · withdrawn
- Solar project AG1-068, Adams CountySolar · 49.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem