United States › Grid › Interconnection queues › Ohio
COAL · PJMKillen Electric Generating Station
Killen Electric Generating Station is a 12.0 MW coal request built and operating in the PJM interconnection queue, in Adams County, Ohio, connecting to Dayton.
Request details
- Queue ID
- U1-090
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dayton
- Connection point (POI)
- Killen 345kV
- Location
- Adams County, Ohio
- Technology
- Coal: 12.0 MW
- Total requested
- 12.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 22 April 2008
- Proposed online date
- May 2008
Location
Marker shows the centre of Adams County; the queue data does not give exact sites.
Other requests in Adams County
- Solar + storage project AH2-146, Adams CountySolar + storage · 87.2 MW · in study
- Solar project AI1-151, Adams CountySolar · 53.2 MW · in study
- Solar + storage project AI2-030, Adams CountySolar + storage · 50.0 MW · in study
- Gavin 2Coal · 20.0 MW · built
- Gavin 1Coal · 20.0 MW · built
- Stuart Electric Generating StationCoal · 7.0 MW · built
- Coal project S12, Adams CountyCoal · 1,300 MW · withdrawn
- Battery storage project AH1-758, Adams CountyBattery storage · 500 MW · withdrawn
- Other project AE1-078, Adams CountyOther · 50.0 MW · withdrawn
- Other project AD2-053, Adams CountyOther · 50.0 MW · withdrawn
- Stone Branch SolarSolar · 49.9 MW · withdrawn
- Solar project AG1-068, Adams CountySolar · 49.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem