COAL Β· PJM

Gavin 1

Gavin 1 is a 20.0 MW coal request built and operating in the PJM interconnection queue, in Adams County, Ohio, connecting to AEP.

Queue statusOperating
  1. PlanningQueued Jan 2006 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingMay 2007 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
P61
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Gavin #1 765kV
Location
Adams County, Ohio
Technology
Coal: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
31 January 2006
Proposed online date
January 2010
Came online
May 2007

Location

Marker shows the centre of Adams County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Adams County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem