United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMStone Branch Solar
Stone Branch Solar is a 49.9 MW solar request withdrawn in the PJM interconnection queue, in Adams County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2016 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- ConsentedNov 2021 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AB2-085
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Adams 138kV
- Location
- Adams County, Ohio
- Technology
- Solar: 49.9 MW
- Total requested
- 49.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 18 April 2016
- Agreement signed
- 1 November 2021
- Proposed online date
- December 2023
- Withdrawn
- March 2025
Location
Marker shows the centre of Adams County; the queue data does not give exact sites.
Other requests in Adams County
- Solar + storage project AH2-146, Adams CountySolar + storage Β· 87.2 MW Β· in study
- Solar project AI1-151, Adams CountySolar Β· 53.2 MW Β· in study
- Solar + storage project AI2-030, Adams CountySolar + storage Β· 50.0 MW Β· in study
- Gavin 2Coal Β· 20.0 MW Β· built
- Gavin 1Coal Β· 20.0 MW Β· built
- Killen Electric Generating StationCoal Β· 12.0 MW Β· built
- Stuart Electric Generating StationCoal Β· 7.0 MW Β· built
- Coal project S12, Adams CountyCoal Β· 1,300 MW Β· withdrawn
- Battery storage project AH1-758, Adams CountyBattery storage Β· 500 MW Β· withdrawn
- Other project AE1-078, Adams CountyOther Β· 50.0 MW Β· withdrawn
- Other project AD2-053, Adams CountyOther Β· 50.0 MW Β· withdrawn
- Solar project AG1-068, Adams CountySolar Β· 49.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem