BATTERY STORAGE Β· MISOBattery storage project J1345, Dodge County
Battery storage project J1345, Dodge County is a 25.0 MW battery storage request withdrawn in the MISO interconnection queue, in Dodge County, Wisconsin, connecting to American Transmission Co..
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedMar 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1345
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- American Transmission Co.
- Connection point (POI)
- North Beaver Dam 69kV Substation
- Location
- Dodge County, Wisconsin
- Technology
- Battery: 25.0 MW
- Total requested
- 25.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 29 April 2019
- Proposed online date
- October 2021
- Withdrawn
- March 2022
Location
Marker shows the centre of Dodge County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Dodge County
- Solar project J1171, Dodge CountySolar Β· 100 MW Β· under construction
- Onshore wind project G368, Dodge CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project G338, Dodge CountyOnshore wind Β· 54.0 MW Β· built
- Solar project J1003, Dodge CountySolar Β· 50.0 MW Β· built
- Other project G306, Dodge CountyOther Β· 200 MW Β· withdrawn
- Onshore wind project G485, Dodge CountyOnshore wind Β· 60.0 MW Β· withdrawn
- Onshore wind project J765, Dodge CountyOnshore wind Β· 4.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem