ONSHORE WIND Β· MISOOnshore wind project G485, Dodge County
Onshore wind project G485, Dodge County is a 60.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Dodge County, Wisconsin.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2004 (completed)
- Withdrawn / abandonedJan 2005 (project stopped here)
- ConsentedJan 2005 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G485
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- S. Fond du Lac - Butternut
- Location
- Dodge County, Wisconsin
- Technology
- Wind: 60.0 MW
- Total requested
- 60.0 MW
- Queue status
- Withdrawn
- Entered queue
- 24 November 2004
- Agreement signed
- 4 January 2005
- Proposed online date
- January 2009
- Withdrawn
- January 2005
Location
Marker shows the centre of Dodge County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Dodge County
- Solar project J1171, Dodge CountySolar Β· 100 MW Β· under construction
- Onshore wind project G368, Dodge CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project G338, Dodge CountyOnshore wind Β· 54.0 MW Β· built
- Solar project J1003, Dodge CountySolar Β· 50.0 MW Β· built
- Other project G306, Dodge CountyOther Β· 200 MW Β· withdrawn
- Battery storage project J1345, Dodge CountyBattery storage Β· 25.0 MW Β· withdrawn
- Onshore wind project J765, Dodge CountyOnshore wind Β· 4.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem