United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

ONSHORE WIND Β· MISO

Onshore wind project J765, Dodge County

Onshore wind project J765, Dodge County is a 4.3 MW onshore wind request withdrawn in the MISO interconnection queue, in Dodge County, Wisconsin.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2016 (completed)
  2. Withdrawn / abandonedJul 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J765
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Dodge County, Wisconsin
Technology
Wind: 4.3 MW
Total requested
4.3 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
14 November 2016
Proposed online date
January 2018
Withdrawn
July 2017

Location

Marker shows the centre of Dodge County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Dodge County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem