United States › Grid › Interconnection queues › Mississippi
ONSHORE WIND · MISOOnshore wind project J3900, Sunflower County
Onshore wind project J3900, Sunflower County is a 163 MW onshore wind request in interconnection study in the MISO interconnection queue, in Sunflower County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..
- PlanningQueued Dec 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2030 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J3900
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI, LLC.
- Connection point (POI)
- INDIANOLA 230/115 SUB - TILLATOBA 230.0kV
- Location
- Sunflower County, Mississippi
- Technology
- Wind: 163 MW
- Total requested
- 163 MW
- Service type
- Network resource (NRIS)
- Queue status
- Active
- Entered queue
- 26 December 2024
- Proposed online date
- April 2030
Location
Marker shows the centre of Sunflower County; the queue data does not give exact sites.
Power plants in Mississippi · Transmission lines in Mississippi
Other requests in Sunflower County
- Solar project J1294, Sunflower CountySolar · 99.0 MW · under construction
- Solar project J604, Sunflower CountySolar · 100 MW · agreement signed
- Onshore wind project J3623, Sunflower CountyOnshore wind · 350 MW · in study
- Solar project J2289, Sunflower CountySolar · 200 MW · in study
- Solar project J4189, Sunflower CountySolar · 200 MW · in study
- Solar project J2740, Sunflower CountySolar · 150 MW · in study
- Solar + storage project J2869, Sunflower CountySolar + storage · 150 MW · in study
- Solar + storage project J2763, Sunflower CountySolar + storage · 100 MW · in study
- Solar project J2297, Sunflower CountySolar · 100 MW · in study
- Onshore wind project J3592, Sunflower CountyOnshore wind · 57.0 MW · in study
- Solar project J3774, Sunflower CountySolar · 303 MW · withdrawn
- Onshore wind project J686, Sunflower CountyOnshore wind · 250 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem