Solar project J4189, Sunflower County

Solar project J4189, Sunflower County is a 200 MW solar request in interconnection study in the MISO interconnection queue, in Sunflower County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..

Queue statusIn planning
  1. PlanningQueued Oct 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Apr 2030 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
J4189
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY MISSISSIPPI, LLC.
Connection point (POI)
ROUNDAWAY SS (CE) - CLARKSDALE 115.0kV
Location
Sunflower County, Mississippi
Technology
Solar: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Queue status
Active
Entered queue
6 October 2025
Proposed online date
April 2030

Location

Marker shows the centre of Sunflower County; the queue data does not give exact sites.

Power plants in Mississippi · Transmission lines in Mississippi

Other requests in Sunflower County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem