Onshore wind project J686, Sunflower County

Onshore wind project J686, Sunflower County is a 250 MW onshore wind request withdrawn in the MISO interconnection queue, in Sunflower County, Mississippi.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2016 (completed)
  2. Withdrawn / abandonedJun 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J686
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Sunflower County, Mississippi
Technology
Wind: 250 MW
Total requested
250 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
11 July 2016
Proposed online date
September 2019
Withdrawn
June 2017

Location

Marker shows the centre of Sunflower County; the queue data does not give exact sites.

Power plants in Mississippi Β· Transmission lines in Mississippi

Other requests in Sunflower County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem