Solar project J3774, Sunflower County is a 303 MW solar request withdrawn in the MISO interconnection queue, in Sunflower County, Mississippi, connecting to ENTERGY MISSISSIPPI, LLC..
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3774
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY MISSISSIPPI, LLC.
- Connection point (POI)
- INDIANOLA 230/115 SUB - TILLATOBA 230.0kV
- Location
- Sunflower County, Mississippi
- Technology
- Solar: 303 MW
- Total requested
- 303 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 17 April 2024
- Proposed online date
- July 2028
- Withdrawn
- December 2025
Location
Marker shows the centre of Sunflower County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Sunflower County
- Solar project J1294, Sunflower CountySolar Β· 99.0 MW Β· under construction
- Solar project J604, Sunflower CountySolar Β· 100 MW Β· agreement signed
- Onshore wind project J3623, Sunflower CountyOnshore wind Β· 350 MW Β· in study
- Solar project J2289, Sunflower CountySolar Β· 200 MW Β· in study
- Solar project J4189, Sunflower CountySolar Β· 200 MW Β· in study
- Onshore wind project J3900, Sunflower CountyOnshore wind Β· 163 MW Β· in study
- Solar project J2740, Sunflower CountySolar Β· 150 MW Β· in study
- Solar + storage project J2869, Sunflower CountySolar + storage Β· 150 MW Β· in study
- Solar + storage project J2763, Sunflower CountySolar + storage Β· 100 MW Β· in study
- Solar project J2297, Sunflower CountySolar Β· 100 MW Β· in study
- Onshore wind project J3592, Sunflower CountyOnshore wind Β· 57.0 MW Β· in study
- Onshore wind project J686, Sunflower CountyOnshore wind Β· 250 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem