Solar project 52, Cochise County

Solar project 52, Cochise County is a 188 MW solar request withdrawn in the West interconnection queue, in Cochise County, Arizona, connecting to Tucson Electric Power Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
52
Grid region
West (non-ISO utilities)
Utility / transmission owner
Tucson Electric Power Company
Connection point (POI)
Winchester 345 kV substation
Location
Cochise County, Arizona
Technology
Solar: 188 MW
Total requested
188 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
29 December 2016
Proposed online date
December 2018

Location

Marker shows the centre of Cochise County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Cochise County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem