United States βΊ Grid βΊ Interconnection queues βΊ Arizona
OTHER Β· WESTOther project 155, Cochise County
Other project 155, Cochise County is a 800 MW other request withdrawn in the West interconnection queue, in Cochise County, Arizona, connecting to Tucson Electric Power Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 155
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Tucson Electric Power Company
- Connection point (POI)
- Greenlee-Winchester 345kV Transmission Line
- Location
- Cochise County, Arizona
- Technology
- Solar: 800 MW Β· Wind Β· Battery
- Total requested
- 800 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 18 April 2023
- Proposed online date
- May 2027
Location
Marker shows the centre of Cochise County; the queue data does not give exact sites.
Other requests in Cochise County
- Solar + storage project 145, Cochise CountySolar + storage Β· 300 MW Β· in study
- Solar + storage project 2023-G11, Cochise CountySolar + storage Β· 300 MW Β· in study
- Onshore wind project 120, Cochise CountyOnshore wind Β· 200 MW Β· in study
- Onshore wind project 169, Cochise CountyOnshore wind Β· 900 MW Β· withdrawn
- Other project 154, Cochise CountyOther Β· 600 MW Β· withdrawn
- Solar + storage project 162, Cochise CountySolar + storage Β· 500 MW Β· withdrawn
- Solar + storage project 161, Cochise CountySolar + storage Β· 500 MW Β· withdrawn
- Solar project 167, Cochise CountySolar Β· 400 MW Β· withdrawn
- Solar + storage project 172, Cochise CountySolar + storage Β· 400 MW Β· withdrawn
- Onshore wind project 168, Cochise CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project 68, Cochise CountyOnshore wind Β· 300 MW Β· withdrawn
- Solar + storage project 150, Cochise CountySolar + storage Β· 300 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem