United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

SOLAR + STORAGE Β· WEST

Solar + storage project 172, Cochise County

Solar + storage project 172, Cochise County is a 400 MW solar + storage request withdrawn in the West interconnection queue, in Cochise County, Arizona, connecting to Tucson Electric Power Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
172
Grid region
West (non-ISO utilities)
Utility / transmission owner
Tucson Electric Power Company
Connection point (POI)
Greenlee-Winchester 345kV Transmission Line
Location
Cochise County, Arizona
Technology
Solar: 400 MW Β· Battery
Total requested
400 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
14 June 2024
Proposed online date
May 2028

Location

Marker shows the centre of Cochise County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Cochise County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem