BATTERY STORAGE Β· MISOBattery storage project J3327, Pike County
Battery storage project J3327, Pike County is a 130 MW battery storage request withdrawn in the MISO interconnection queue, in Pike County, Indiana, connecting to Southern Indiana Gas & Electric Company d/b/a Centerpoint Energy Indiana South.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedSep 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3327
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Southern Indiana Gas & Electric Company d/b/a Centerpoint Energy Indiana South
- Connection point (POI)
- Cato 138/69kV (facilities above 100kV)
- Location
- Pike County, Indiana
- Technology
- Battery: 130 MW
- Total requested
- 130 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 16 April 2024
- Proposed online date
- May 2027
- Withdrawn
- September 2025
Location
Marker shows the centre of Pike County; the queue data does not give exact sites.
Other requests in Pike County
- Solar project J1027, Pike CountySolar Β· 150 MW Β· agreement signed
- Solar project J1028, Pike CountySolar Β· 150 MW Β· agreement signed
- Solar project J1393, Pike CountySolar Β· 130 MW Β· agreement signed
- Replace 250MW of the existing Petersburg coal unit with PV and DC-coupled battery storage; Petersburg 2Solar + storage Β· 250 MW Β· in study
- Battery storage project S1112, Pike CountyBattery storage Β· 130 MW Β· in study
- Surplus; PetersburgOther Β· 3.0 MW Β· in study
- Solar project J1396, Pike CountySolar Β· 150 MW Β· built
- Coal project G646, Pike CountyCoal Β· 30.0 MW Β· built
- Gas project G011, Pike CountyGas Β· 900 MW Β· withdrawn
- Solar project J2164, Pike CountySolar Β· 250 MW Β· withdrawn
- Solar project J2507, Pike CountySolar Β· 250 MW Β· withdrawn
- Solar project J3997, Pike CountySolar Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem