United States β€Ί Grid β€Ί Interconnection queues β€Ί North Dakota

ONSHORE WIND Β· MISO

Onshore wind project J713, Oliver County

Onshore wind project J713, Oliver County is a 300 MW onshore wind request withdrawn in the MISO interconnection queue, in Oliver County, North Dakota, connecting to MINNESOTA POWER INC..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2017 (completed)
  2. Withdrawn / abandonedJan 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J713
Grid region
MISO (Midcontinent)
Utility / transmission owner
MINNESOTA POWER INC.
Connection point (POI)
Square Butte East 230kV Substation
Location
Oliver County, North Dakota
Technology
Wind: 300 MW
Total requested
300 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
16 June 2017
Proposed online date
September 2020
Withdrawn
January 2021

Location

Marker shows the centre of Oliver County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Oliver County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem