United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
ONSHORE WIND Β· MISOOnshore wind project J1888, Oliver County
Onshore wind project J1888, Oliver County is a 175 MW onshore wind request withdrawn in the MISO interconnection queue, in Oliver County, North Dakota, connecting to MINNESOTA POWER INC..
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1888
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MINNESOTA POWER INC.
- Connection point (POI)
- Square Butte 230 kV Substation East
- Location
- Oliver County, North Dakota
- Technology
- Wind: 175 MW
- Total requested
- 175 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 3; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 25 January 2022
- Proposed online date
- April 2024
- Withdrawn
- October 2025
Location
Marker shows the centre of Oliver County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Oliver County
- Onshore wind project MPC04000, Oliver CountyOnshore wind Β· 300 MW Β· agreement signed
- Onshore wind project GEN-2016-004, Oliver CountyOnshore wind Β· 202 MW Β· agreement signed
- Onshore wind project J2080, Oliver CountyOnshore wind Β· 200 MW Β· in study
- Coal project MPC01300, Oliver CountyCoal Β· 455 MW Β· built
- Onshore wind project MPC02100, Oliver CountyOnshore wind Β· 100 MW Β· built
- Onshore wind project G502, Oliver CountyOnshore wind Β· 50.0 MW Β· built
- Coal project G581, Oliver CountyCoal Β· 600 MW Β· withdrawn
- Onshore wind project H082, Oliver CountyOnshore wind Β· 500 MW Β· withdrawn
- Onshore wind project MPC01600, Oliver CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project J713, Oliver CountyOnshore wind Β· 300 MW Β· withdrawn
- Solar + storage project J3182, Oliver CountySolar + storage Β· 200 MW Β· withdrawn
- Onshore wind project J511, Oliver CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem