United States β€Ί Grid β€Ί Interconnection queues β€Ί North Dakota

ONSHORE WIND Β· MISO

Onshore wind project MPC01600, Oliver County

Onshore wind project MPC01600, Oliver County is a 400 MW onshore wind request withdrawn in the MISO interconnection queue, in Oliver County, North Dakota, connecting to Minnkota Power Cooperative.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
MPC01600
Grid region
MISO (Midcontinent)
Utility / transmission owner
Minnkota Power Cooperative
Connection point (POI)
Contor Rod River Valley 345 kV 1\/ Line
Location
Oliver County, North Dakota
Technology
Wind: 400 MW
Total requested
400 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
24 November 2008
Proposed online date
March 2012

Location

Marker shows the centre of Oliver County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Oliver County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem