United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Blackbird Solar

Blackbird Solar is a 152 MW solar request withdrawn in the ERCOT interconnection queue, in Mitchell County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedSep 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0266
Grid region
ERCOT (Texas)
Developer
ABEI ENERGY&INFRASTRUCTURE LLC
Connection point (POI)
1318 China Grove 138kV
Location
Mitchell County, Texas
Technology
Solar: 152 MW
Total requested
152 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
11 March 2019
Proposed online date
February 2022
Withdrawn
September 2020

Location

Marker shows the centre of Mitchell County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Mitchell County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem