United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
BATTERY STORAGE Β· SPPBattery storage project GEN-2024-191, Mercer County
Battery storage project GEN-2024-191, Mercer County is a 199 MW battery storage request withdrawn in the SPP interconnection queue, in Mercer County, North Dakota, connecting to BEPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2025 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2024-191
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- BEPC
- Connection point (POI)
- Antelope Valley - Leland Olds 345 kV Line
- Location
- Mercer County, North Dakota
- Technology
- Battery: 199 MW
- Total requested
- 199 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 1 March 2025
- Proposed online date
- December 2028
Location
Marker shows the centre of Mercer County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Mercer County
- Solar project GEN-2019-037, Mercer CountySolar Β· 150 MW Β· agreement signed
- Gas project ERAS-2025-012, Mercer CountyGas Β· 750 MW Β· in study
- Gas project ERAS-2025-011, Mercer CountyGas Β· 750 MW Β· in study
- Onshore wind project GEN-2024-141, Mercer CountyOnshore wind Β· 424 MW Β· in study
- Solar project GEN-2024-284, Mercer CountySolar Β· 199 MW Β· in study
- Onshore wind project GI-1508, Mercer CountyOnshore wind Β· 172 MW Β· in study
- Onshore wind project GEN-2016-130, Mercer CountyOnshore wind Β· 202 MW Β· built
- Other project GI-0101, Mercer CountyOther Β· 8.0 MW Β· built
- Solar project GEN-2021-072, Mercer CountySolar Β· 600 MW Β· withdrawn
- Coal project GI-0321, Mercer CountyCoal Β· 510 MW Β· withdrawn
- Gas project GEN-2021-095, Mercer CountyGas Β· 447 MW Β· withdrawn
- Gas project GEN-2021-094, Mercer CountyGas Β· 447 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem