United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project G729, Otter Tail County

Onshore wind project G729, Otter Tail County is a 2.5 MW onshore wind request withdrawn in the MISO interconnection queue, in Otter Tail County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2007 (completed)
  2. Withdrawn / abandonedMar 2007 (project stopped here)
  3. ConsentedMar 2007 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G729
Grid region
MISO (Midcontinent)
Connection point (POI)
Pelican Rapids NW Jct 41.6 kV Substation
Location
Otter Tail County, Minnesota
Technology
Wind: 2.5 MW
Total requested
2.5 MW
Queue status
Withdrawn
Entered queue
25 January 2007
Agreement signed
19 March 2007
Proposed online date
October 2009
Withdrawn
March 2007

Location

Marker shows the centre of Otter Tail County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Otter Tail County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem