United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

SOLAR + STORAGE Β· MISO

Solar + storage project J2598, Mower County

Solar + storage project J2598, Mower County is a 198 MW solar + storage request withdrawn in the MISO interconnection queue, in Mower County, Minnesota, connecting to ITC MIDWEST.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2598
Grid region
MISO (Midcontinent)
Utility / transmission owner
ITC MIDWEST
Connection point (POI)
Adams to Hayward 161 kV Tap
Location
Mower County, Minnesota
Technology
Solar: 198 MW Β· Battery
Total requested
198 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
14 September 2022
Proposed online date
June 2026
Withdrawn
October 2025

Location

Marker shows the centre of Mower County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Mower County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem