United States β€Ί Grid β€Ί Interconnection queues β€Ί Louisiana

OTHER Β· MISO

Other project J417, Calcasieu Parish County

Other project J417, Calcasieu Parish County is a 43.0 MW other request withdrawn in the MISO interconnection queue, in Calcasieu Parish County, Louisiana.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2014 (completed)
  2. Withdrawn / abandonedNov 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J417
Grid region
MISO (Midcontinent)
Connection point (POI)
Entergy 230 kV Graywood substation Big Lake Road
Location
Calcasieu Parish County, Louisiana
Technology
Other: 43.0 MW
Total requested
43.0 MW
Study phase
Int FaS
Queue status
Withdrawn
Entered queue
17 November 2014
Withdrawn
November 2015

Location

Marker shows the centre of Calcasieu Parish County; the queue data does not give exact sites.

Power plants in Louisiana Β· Transmission lines in Louisiana

Other requests in Calcasieu Parish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem