Gas project J331, Calcasieu Parish County

Gas project J331, Calcasieu Parish County is a 338 MW gas request withdrawn in the MISO interconnection queue, in Calcasieu Parish County, Louisiana.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2014 (completed)
  2. Withdrawn / abandonedJan 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J331
Grid region
MISO (Midcontinent)
Connection point (POI)
New Entergy Michigan Substation
Location
Calcasieu Parish County, Louisiana
Technology
Gas: 338 MW
Total requested
338 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
16 May 2014
Withdrawn
January 2016

Location

Marker shows the centre of Calcasieu Parish County; the queue data does not give exact sites.

Power plants in Louisiana Β· Transmission lines in Louisiana

Other requests in Calcasieu Parish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem