United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
SOLAR Β· MISOSolar project J2163, Calcasieu Parish County
Solar project J2163, Calcasieu Parish County is a 200 MW solar request withdrawn in the MISO interconnection queue, in Calcasieu Parish County, Louisiana, connecting to ENTERGY LOUISIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2022 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2163
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY LOUISIANA
- Connection point (POI)
- 230 kV: Penton Road to Roy S Nelson 230 kV
- Location
- Calcasieu Parish County, Louisiana
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 13 July 2022
- Proposed online date
- October 2024
- Withdrawn
- March 2025
Location
Marker shows the centre of Calcasieu Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in Calcasieu Parish County
- Solar project J1598, Calcasieu Parish CountySolar Β· 325 MW Β· agreement signed
- Entergy Louisiana LRZ 9 Generation ResourceGas Β· 770 MW Β· in study
- Solar + storage project J2899, Calcasieu Parish CountySolar + storage Β· 250 MW Β· in study
- Battery storage project J4079, Calcasieu Parish CountyBattery storage Β· 150 MW Β· in study
- Solar project J2292, Calcasieu Parish CountySolar Β· 50.0 MW Β· in study
- Gas project J484, Calcasieu Parish CountyGas Β· 1,056 MW Β· built
- Gas project J3796, Calcasieu Parish CountyGas Β· 770 MW Β· withdrawn
- Solar project J2176, Calcasieu Parish CountySolar Β· 680 MW Β· withdrawn
- Solar + storage project J2890, Calcasieu Parish CountySolar + storage Β· 440 MW Β· withdrawn
- Gas project J331, Calcasieu Parish CountyGas Β· 338 MW Β· withdrawn
- Solar project J1541, Calcasieu Parish CountySolar Β· 200 MW Β· withdrawn
- Solar project J2167, Calcasieu Parish CountySolar Β· 198 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem